The installation process of Asphalt Rubber Plant is not simple and requires multiple steps and professional operations. The first is the preparation before installation. Make sure that the ground of the installation site is flat and solid and can bear the weight of the equipment. At the same time, check whether the various parts of the equipment are damaged during transportation and check whether the parts are complete.
Then enter the formal installation. First install the main frame of the equipment, splice and fix the various frame parts according to the instructions, and ensure that the installation position is accurate and the angle is vertical. Then install the core components, such as the mixing device, heating system and conveying pipeline. When installing these components, pay attention to tight connection to prevent leakage and air leakage. After the mixing device is installed, check whether the rotation is smooth.
After the main components are installed, it is necessary to connect the electrical system and connect the circuit and control circuit of the equipment. This process must be particularly careful to avoid connecting the wrong line. Finally, it is the debugging stage. Power on the Asphalt Rubber Plant to check whether the various components are operating normally and whether the parameters such as temperature and pressure are within the specified range. If problems are found, they should be adjusted in time until the equipment can operate stably, and the entire installation is completed.