The preparation work before the Asphalt Distributor Truck is crucial and related to the construction quality and safety.
First, a comprehensive inspection of the vehicle should be carried out. Check whether the tire pressure is normal to ensure stable driving; check the brake system to ensure that the brake is sensitive and reliable to prevent safety hazards during operation. Carefully check the hydraulic system to see if there is any oil leakage and whether the hydraulic components can work normally, because the hydraulic system affects the lifting and spraying operation of the spreading device.
Next is the tank and pipeline inspection. Check the sealing of the asphalt tank to prevent asphalt leakage during operation, causing waste and environmental pollution. Check whether the pipeline is blocked or damaged, and clean or replace it in time if necessary.
Then perform the preheating operation. Turn on the thermal oil heating system to heat the asphalt in the asphalt tank to the appropriate construction temperature. Different types of asphalt have different temperature requirements and must be strictly implemented in accordance with the standards. At the same time, start the asphalt pump to circulate the asphalt in the pipeline to ensure uniform asphalt fluidity.
Finally, prepare the auxiliary tools and safety protection supplies required for construction and plan the operation route. Only by doing these preparations can the Asphalt Distributor Truck complete the spreading operation efficiently and safely.