500 Ton Large Capacity Bitumen Tank

500 Ton Large Capacity Bitumen Tank
Details:
A 500-ton bitumen storage tank provides bulk storage for asphalt mixing plants, highway construction projects, and bitumen terminals. Heating, insulation, pumping, and monitoring systems can be configured according to the bitumen grade, operating temperature, daily consumption, and site conditions.
Send Inquiry
Description
Send Inquiry

Product Overview

 

500-Ton Bitumen Storage for High-Volume Asphalt Production
A 500-ton bitumen storage tank provides bulk storage for asphalt mixing plants, highway construction projects, and bitumen terminals. Heating, insulation, pumping, and monitoring systems can be configured according to the bitumen grade, operating temperature, daily consumption, and site conditions.
500-Metric-Ton Storage Capacity
Designed around a target bitumen storage quantity of 500 metric tons. Final tank volume depends on bitumen density at the relevant temperature and the allowable filling level.
Integrated Heating System
Thermal oil heating coils can be configured to meet the required operating temperature and heat-up time, subject to thermal calculations.
Thermal Insulation
Mineral wool insulation and protective metal cladding are available to manage heat loss under specified operating and ambient conditions.
Bitumen Transfer System
Pumps, heated pipelines, valves, and monitoring instruments can be selected to match the required transfer flow rate and downstream plant connections.

 

Tank Configurations & Key Features

 

Configuration Options for Different Project Requirements
Vertical or Horizontal Design

Vertical tanks suit sites where ground footprint is limited. Horizontal tanks can be considered for sites with height restrictions or specific transport requirements.
Heating & Temperature Control
Thermal oil heating is available as a configuration option. Heating capacity, coil arrangement, and temperature monitoring are determined by the bitumen grade and required operating conditions.
Insulation & External Cladding
Mineral wool insulation, with thickness options such as 100 mm or 150 mm subject to design confirmation, can be combined with suitable external cladding.
Pump & Pipeline Configuration
Pump capacity, motor power, pipeline diameter, valves, and heating arrangements are selected according to bitumen viscosity, operating temperature, transfer distance, and required flow rate.
Instrumentation & Automation
Temperature sensors, level indicators, high-level alarms, and PLC-based controls can be included according to the agreed control and safety requirements.

 

Technical Specifications

 

Final specifications are confirmed during engineering design.

Parameter

Specification

Target Storage Capacity

500 metric tons

Tank Orientation

Vertical or horizontal

Applicable Material

Paving-grade bitumen; PMB subject to technical review

Geometric Tank Volume

Calculated from bitumen density and allowable filling level

Operating Temperature

Project-specific

Heating Method

Thermal oil heating; alternatives subject to review

Insulation Material

Mineral wool or specified alternative

Insulation Thickness

Project-specific; 100 mm or 150 mm options

External Cladding

Aluminum, stainless steel, or coated steel

Bitumen Transfer

Pump and pipeline system sized to required duty

Monitoring & Controls

Temperature and level monitoring; optional PLC integration

Design Code

Selected according to tank type, design conditions, and local regulations

Inspection & Documentation

Defined by the approved inspection plan and purchase specification

 

Manufacturing & Quality Control

 

Inspection and Documentation for Project Verification
Material Traceability
Steel plates and piping are checked against approved material specifications. Material test certificates can be supplied according to the agreed documentation scope.
Welding Quality Control
Welding procedures, welder qualifications, and inspection activities are managed according to the applicable design requirements and approved inspection plan.
Testing & Inspection
Visual inspection, applicable non-destructive testing, and required pressure or leak tests are specified according to the tank and heating system design.
Technical Documentation
The agreed documentation package may include general arrangement drawings, material records, welding and inspection reports, test records, and operation and maintenance manuals.

 

Applications & System Integration

 

Designed Around Actual Site Requirements
Asphalt Mixing Plants
Bulk bitumen storage and controlled transfer to asphalt production equipment.
Highway & Road Construction
Storage capacity planned around project consumption, tanker delivery schedules, and site operating conditions.
Bitumen Terminals
Integration into multi-tank storage systems with coordinated heating, pumping, and pipeline connections.
Installation & Interface Requirements
Foundation loads, installation space, transport restrictions, electrical supply, flange standards, pump duty, and control interfaces should be confirmed before manufacturing.

 

Customization & RFQ Requirements

 

Request a Project-Specific Technical Proposal
Provide the following information to support accurate equipment selection and quotation.
Storage Requirements
Target usable capacity, bitumen grade, density data if available, daily consumption, and delivery frequency.
Heating Requirements
Initial filling temperature, target operating temperature, required heat-up time, preferred heat source, and ambient temperature range.
Transfer Requirements
Required flow rate, delivery pressure, pipeline distance, and connection specifications.
Site & Compliance Requirements
Available footprint, height restrictions, foundation information, power supply, transport limitations, applicable design codes, and inspection requirements.
Supply Scope
Specify whether the order includes the tank only or a complete system with heating equipment, pumps, pipelines, instrumentation, and controls.

 

Frequently Asked Questions

 

Q: How is the volume of a 500-ton bitumen tank calculated?

A: The geometric volume is calculated from the target bitumen mass, density at the relevant temperature, and allowable filling level. The final dimensions are confirmed during engineering design.

Q: Can the tank maintain bitumen at 150°C to 180°C?

A: The required temperature range must be confirmed against the bitumen grade, heating system design, and operating requirements. The heating configuration is selected accordingly.

Q: How is the heating capacity determined?

A: The calculation considers bitumen mass, initial and target temperatures, required heat-up time, thermal losses, and heating coil performance.

Q: Can the tank connect to an existing asphalt plant?

A: Yes, subject to an interface review covering pump capacity, pipeline dimensions, flange standards, electrical supply, control signals, and installation space.

Q: What quality documents are available?

A: Documents depend on the agreed project scope and applicable requirements. They may include material certificates, welding and inspection records, test reports, approved drawings, and operating manuals.

 

Request a Quote for a 500-Ton Bitumen Tank

 

Send your storage requirements, bitumen grade, target temperature, heating preferences, site layout, and applicable design requirements to obtain a project-specific technical proposal.

Hot Tags: 500 ton large capacity bitumen tank, China 500 ton large capacity bitumen tank manufacturers, suppliers, factory

Send Inquiry