Towable Bitumen Storage, Heating and Transfer for Road Construction Projects
A Towing Type Mobile Bitumen Tank is used to store, heat and transfer bitumen at road construction sites, mobile asphalt plants and temporary infrastructure projects. Tank capacity, heating method, insulation, transfer pump and towing chassis can be configured according to project requirements.
The main selection factors are required storage volume, bitumen grade, operating temperature, heating time, transfer rate, site power supply and transport regulations.
Product Overview
Mobile Bitumen Storage and Handling
On-Site Storage
Provides temporary or project-based bitumen storage where a fixed tank installation is not practical. Tank capacity can be selected according to consumption and replenishment schedules.
Heating and Temperature Control
Available heating configurations may include thermal oil systems or electric heating. Heating capacity and insulation are selected according to bitumen grade, ambient conditions and target operating temperature.
Bitumen Transfer
A compatible pump, heated piping and suitable discharge connections support transfer to asphalt mixing plants or other receiving equipment. Pump selection depends on bitumen viscosity, required flow rate and delivery pressure.
Towable Chassis
Chassis configuration, axle arrangement, braking system and towing connections are selected according to site mobility requirements and applicable transport regulations.
Configuration and Selection Guide
|
Selection Factor |
What to Confirm |
|
Storage capacity |
Daily bitumen consumption, usable volume and delivery intervals |
|
Heating system |
Heating method, installed capacity, target temperature and heating time |
|
Thermal insulation |
Insulation thickness, material and required heat retention |
|
Transfer pump |
Flow rate, viscosity, operating temperature, pressure and motor power |
|
Towing system |
Gross weight, axle loads, hitch type, brakes and transport dimensions |
|
Electrical system |
Site voltage, frequency, phase and control requirements |
|
Plant connection |
Pipe diameter, flange dimensions, hose connections and control interfaces |
Technical Specifications
The following values are preliminary selection ranges, not confirmed specifications for every model. Final parameters depend on the approved design and equipment configuration.
|
Parameter |
Preliminary Range or Available Option |
|
Product type |
Towing Type Mobile Bitumen Tank |
|
Nominal capacity |
10,000–50,000 L, subject to model confirmation |
|
Tank configuration |
Horizontal cylindrical tank with towing chassis |
|
Tank material |
Carbon steel; grade to be confirmed |
|
Shell thickness |
Project-specific engineering calculation |
|
Heating method |
Thermal oil heating or electric heating, subject to configuration |
|
Operating temperature |
Up to 180°C, subject to design and component ratings |
|
Insulation |
50–100 mm as a preliminary option, subject to confirmation |
|
Transfer pump |
Positive-displacement pump; flow rate to be selected for operating conditions |
|
Axle configuration |
Single, tandem or triple axle, subject to load calculations |
|
Temperature monitoring |
Temperature sensors and digital controller; PLC available if specified |
|
Surface protection |
Surface preparation, primer and coating system to be specified |
|
Applicable standards |
Confirmed according to design, destination market and regulatory requirements |
Manufacturing Quality and Inspection
Quality Verification Before Delivery
Material Documentation
Material certificates and traceability records can be specified according to the procurement requirements and applicable inspection plan.
Welding and Structural Inspection
Welding procedures, welder qualifications, visual inspection and any required non-destructive testing should follow the approved design and applicable standards.
Tank and Heating Circuit Testing
Leakage checks and pressure tests should be defined separately for the storage tank and heating circuit according to their design conditions and applicable requirements.
Heating, Pump and Electrical Checks
Where included in the equipment scope, pre-delivery checks can cover temperature monitoring, pump operation, motor rotation, control functions and emergency-stop circuits.
Inspection Documentation
The inspection plan may specify material certificates, welding records, test reports and factory inspection records. Third-party inspection must be agreed upon before production.
Applications and Equipment Integration
Road and Highway Construction
Provides on-site bitumen storage and transfer near paving operations, subject to project logistics and heating requirements.
Mobile Asphalt Plants
Can be configured to supply bitumen to a mobile asphalt mixing plant when pump capacity, piping and connection requirements are compatible.
Remote Construction Sites
Heating, insulation and power arrangements can be selected according to local climate, available utilities and site operating conditions.
Equipment Rental Fleets
Capacity, towing configuration, connection interfaces and cleaning requirements can be specified for the intended operating and relocation schedule.
Customization and RFQ Requirements
Provide the following information to support technical evaluation and quotation.
Project location and destination country
Required nominal and usable tank capacity
Bitumen grade, including whether polymer-modified bitumen (PMB) is used
Target operating temperature and required heating time
Preferred heating method and available energy supply
Required pump flow rate, delivery pressure and connection dimensions
Site-only movement or public-road towing requirements
Electrical voltage, frequency and phase
Required design standards, inspections and documentation
Delivery schedule, unloading arrangements and installation requirements
Drawings, existing plant connection details and site constraints are useful for confirming the proposed configuration.
Frequently Asked Questions
Q: What is a towing type mobile bitumen tank used for?
A: It stores, heats and transfers bitumen at road construction sites, mobile asphalt plants and temporary infrastructure projects where relocatable storage is required.
Q: How do I determine the required tank capacity?
A: Consider daily bitumen consumption, delivery intervals, required reserve stock and usable tank volume. Allow for operating limits and the actual filling and discharge arrangement.
Q: Which heating method should I choose?
A: The choice depends on available utilities, bitumen grade, target temperature, required heating time and operating schedule. Thermal oil and electric heating options should be compared using the proposed heating duty and system design.
Q: Can the tank supply an existing asphalt mixing plant?
A: It can be configured for plant integration when the pump, piping, discharge connections, temperature requirements and control interfaces match the receiving equipment.
Q: Can the tank be towed on public roads?
A: Public-road use depends on the completed vehicle configuration and the destination country's requirements for dimensions, total weight, axle loads, braking, lighting and vehicle approval. Confirm these requirements before ordering.
Request a Technical Proposal and Quotation
Share your required capacity, bitumen grade, heating conditions, transfer requirements and destination country to receive a configuration proposal based on your project needs.
Hot Tags: towing type mobile bitumen tank, China towing type mobile bitumen tank manufacturers, suppliers, factory

